IN THIS GUIDE · READ TOP DOWN

Written by Ivan Bodnar, independent home renovation specialist with about 15 years of hands-on residential renovation experience.

Home  /  Tiling Guides from Ivan  /  Why Surface Preparation Matters

GUIDE — SURFACE PREPARATION

Why surface preparation matters more than the tile you choose.

When you’re planning new tiles, it’s natural to think about colour, size and finish. The surface underneath gets far less attention, yet that’s usually what decides whether the finished job holds up.

THE COMMON MISTAKE

A common mistake is focusing on how the new tiles will look without properly checking the surface they’re going onto.

Tiles are rigid and unforgiving. They follow whatever sits beneath them. If the floor or wall is out of level, moves, or holds moisture, the tiles can’t correct it. Over time that can show up as lippage between tiles, hollow-sounding spots, cracked grout or tiles that crack or lift.

That’s why I look at the substrate before I price a job. It’s the least visible part of the work, and often the most important.

THE LAYERS, FROM THE TILE DOWN

Think of a tiled floor as a cross-section. Each layer depends on the one below it.

LAYER 01 — SURFACE

The tile is the part you see, and the last part to go down.

Colour, size and finish matter, and I’m happy to talk them through. But a good tile laid over a poor base will still give a poor result.

LAYER 02 — SETTING-OUT

Setting-out decides where the joints and cuts fall.

Planning the layout before tiling helps avoid thin slivers at edges and doorways. It only works if the surface is true enough for the lines to hold across the room.

LAYER 03 — BED

The adhesive bed bonds the tile. It isn't there to fix the floor.

Using extra adhesive to hide dips and humps can leave gaps behind the tile. A flat, sound surface lets the bed do its actual job: good, even contact.

LAYER 04 — SUBSTRATE

AN UNEVEN, UNSTABLE OR DAMP SUBSTRATE CAN COMPROMISE THE WHOLE JOB.

The substrate is the concrete, sheeting or existing surface everything else sits on. Whatever is wrong with it, whether it’s out of level, moving or holding moisture, eventually shows through the tiles above. Dealing with it first is usually cheaper than redoing the tiling later.

ON SITE

WHAT I LOOK AT BEFORE QUOTING

Level. Whether the floor or wall is flat enough to tile, or needs work first.

Movement. Signs of flex, loose sheeting or cracking that could carry through to new tiles.

Moisture. Dampness or past water damage that needs attention before anything is laid.

What’s already there. Whether old tiles or adhesive are sound, or need to come off.

Tiling is one part of the job. In wet areas, waterproofing is a separate component, and plumbing and electrical work are done by appropriately licensed specialists, whom I coordinate where your job needs them. Tiling, Waterproofing and Plumbing: Who Does What explains how these fit together.

This guide is general. It doesn’t replace an on-site assessment or professional advice, because every property’s condition is different. Your quote, scope and timeframe depend on what I find when I look at the property and the work you need.

If you’re planning floor tiling, bathroom tiling or tile replacement, I’m happy to come and look at the surface first, at no cost. Before you get in touch, What to Include When You Ask for a Tiling Quote may help.