Home  /  FAQ

QUESTIONS AND ANSWERS

Tiling, and what sits beside it: common questions.

Before a tiling job starts, homeowners usually want to know a few things: how the quote works, when the work can start, what the surface underneath needs, and who handles the parts of the job that aren’t tiling.

The answers here are general. Your quote, scope and timeframe are worked out after a free assessment of your property and the work you need.

ON THIS PAGE

Answered by Ivan Bodnar, independent home renovation specialist with about 15 years of hands-on residential renovation experience.

A

GROUP A — QUOTES AND THE ASSESSMENT

QUOTES AND THE FREE ASSESSMENT

Is the assessment really free?

Yes. I offer a free site visit to look at the area, talk through what you need and check the surface the tiles will go on. The detailed quote comes after that visit, so it’s based on your property rather than a guess.

Can you give me a price over the phone or from photos?

Photos help me understand the job and decide what to look at on site. I don’t put a firm price on tiling from a description alone, though. The cost depends on things I can only check in person: whether the substrate is level and sound, whether the old tiles need to come off, and how the room is laid out.

What does the quote cover?

It covers the tiling and the surface preparation that the assessment shows your job needs. If the job also involves waterproofing, plumbing, electrical or other regulated work, I list that as a separate part of the job, because appropriately licensed specialists carry it out. The licensed work questions below explain how that works.

Who will I actually be dealing with?

You’ll be dealing with me. I work independently as a sole trader, so I’m the one who talks with you, inspects the property, discusses the scope and oversees the work from the assessment onward. You can read more about me and how I started.

B

GROUP B — TIMING, AVAILABILITY AND PREPARATION

TIMING, AVAILABILITY AND PREPARATION

How soon can you start?

That depends on where you are and what the job involves, so I confirm availability when you enquire. I work across metropolitan Melbourne and surrounding suburbs, including the inner, bayside and south-eastern suburbs. See the service area for more detail.

How long will the job take?

I won’t guess before I’ve seen it. These are the things that usually change the timeframe:

  • the size and layout of the area being tiled
  • whether the existing tiles have to be removed first
  • how much the substrate needs repairing or levelling
  • drying or curing times for preparation products and adhesive
  • whether other trades need to finish their part before tiling can start

You get a realistic timeframe with the quote, and it depends on what the assessment finds.

What preparation might my floor or wall need?

It depends on what’s underneath. An uneven surface may need levelling, loose or damaged sections may need repair, and any sign of moisture has to be understood before a tile goes down. An uneven, unstable or moisture-affected substrate can compromise the finished job, however good the tiles look on the day. My guide on why surface preparation matters explains this in more detail.

Do I need to do anything before the assessment?

Not much. Clear access to the area makes the visit easier. If you’ve already chosen your tiles, keep the details handy. If you haven’t, I can talk you through practical options that suit the room and the surface.

C

GROUP C — WATERPROOFING, PLUMBING AND LICENSED WORK

WATERPROOFING, PLUMBING AND LICENSED WORK

A tiled bathroom, kitchen or laundry often involves more than tiling. Some parts of the job are regulated work. I don’t do those parts myself. Appropriately licensed specialists carry them out within their own authorised scope.

Do you do the waterproofing?

No. Waterproofing is a separate component from the tiling. Where your job needs it, an appropriately licensed or qualified specialist carries it out, and I can coordinate their involvement so it fits into the right place in the job. Tiling, waterproofing and plumbing: who does what covers this in more depth.

What about plumbing and electrical work?

It works the same way. I don’t personally do licensed plumbing or electrical work. If your job means moving a tap or a waste, or adding a power point near a new splashback, a licensed plumber or electrician does that part.

What if a floor or wall needs structural work?

Structural engineering and architectural work are outside my scope. If the assessment turns up something that needs that kind of advice, I’ll tell you plainly, and the right qualified specialist should be brought in before any tiling goes ahead.

How does the coordination work?

At the assessment I point out any parts of your job that need licensed trades. I explain where their work comes in the sequence and coordinate their involvement as needed. How a job runs sets out the steps from your enquiry to the finished work.

D

GROUP D — BEFORE YOU ENQUIRE

WHAT TO SEND WITH AN ENQUIRY

What needs tiling: a floor, a wall, a splashback or a whole room, and roughly how big it is.

Your suburb, so I can confirm availability.

What’s there now: old tiles, bare sheet or concrete.

Anything you’ve noticed, such as cracked, loose or hollow-sounding tiles, or signs of damp.

Photos of the area. You can text them to 0413 142 055.

Send your enquiry through the form, text me directly or email [email protected]. I’m available 9am to 5pm, seven days a week. I’ll read your enquiry and get in touch as availability allows.