Home  /  How I Work

HOW I WORK · FOUR STEPS

How a job runs, from your first message to the finished tiles.

I’m Ivan Bodnar, an independent home renovation specialist in Melbourne. Every job I take on follows the same four steps, and you deal with me at each one. The order matters: I look at the surface underneath before I put a price on what goes on top.

A gloved worker spreads gray mortar with a trowel beneath large floor tiles, with blue tile-leveling spacers visible.

Laying floor tiles over an adhesive bed

BEFORE STEP 01

USEFUL TO HAVE READY

■  What needs tiling: a floor, a wall, a splashback, or a few damaged tiles

■  The suburb the property is in

■  Photos of the area, including any cracked, loose or lifting tiles

■  Whether you’ve already chosen tiles

■  Any other work planned in the same room, such as plumbing changes

None of this has to be perfect. A rough description is enough to start, and I’ll work out the rest at the assessment. For more detail, see what to include when you ask for a tiling quote.

THE PROCESS

FOUR STEPS, ALWAYS IN THIS ORDER

Skipping the assessment is how jobs go wrong. New tiles laid over an uneven, unstable or moisture-affected surface can let down the finished result, however good the tiles are. Read more in Why Surface Preparation Matters.

01

Enquire

Send a short description of the job through the enquiry form, or text me on 0413 142 055 with the suburb and a few photos. Photos help me understand the room and the existing tiles before I visit.

02

Free assessment

I visit the property at no cost to talk through what you need and check the substrate: whether it’s level, whether it moves, and whether there are signs of moisture. This is where I find out what the job really involves.

03

Detailed quote

The quote is based on what I found on site, not a guess from a photo. It sets out the scope as assessed, and I’ll explain the condition of the surface, your options and any likely complications plainly, without promising what I can’t support.

04

Work overseen by Ivan

I oversee the work myself from the assessment onward, so the person you spoke to at the start is the person responsible on site. Preparation comes first, then setting-out, then tile installation.

AVAILABILITY AND TIMEFRAMES

DATES ARE SET AFTER THE ASSESSMENT, NOT BEFORE

How long a job takes depends on the room, the size of the area, the tiles you’ve chosen and, most of all, the condition of the surface underneath. A floor that needs levelling, or a wall with old adhesive to remove, adds time that no one can see in a photo.

So I confirm my availability and a realistic timeframe case by case, once I’ve seen the property. I don’t give fixed completion dates up front. I’d rather tell you what the job involves than promise a date the substrate won’t allow. I’m contactable 9am to 5pm, seven days a week, and availability for your suburb is confirmed when you enquire.

WHERE OTHER TRADES FIT

TILING, AND WHAT SITS BESIDE IT

Some jobs need regulated work as well as tiling. That work is a separate component, and it’s handled separately.

WHAT I DO

Assessing the surface, preparing it, setting out and installing wall and floor tiles, and replacing damaged tiles. I also oversee the job and keep you informed throughout.

See Residential Tiling for the full range.

DONE BY LICENSED SPECIALISTS

Waterproofing, plumbing, electrical work and anything structural are done by appropriately licensed specialists within their authorised scope. When your job needs them, I coordinate their involvement around the tiling.

More in Tiling, Waterproofing and Plumbing: Who Does What and common questions.

STEP 01 STARTS HERE

TELL ME ABOUT THE JOB

A short description and a few photos are enough to begin. From there I’ll arrange a free assessment if the job suits, and the quote follows from what I find.